Sending a vague request for quotation is the fastest way to get a vague, slow, and ultimately useless price. A proper LED letter sign RFQ checklist turns a hopeful email into a document a factory can price the same day, with fewer rounds of questions and fewer surprises at delivery. This guide gives you the checklist to send, explains what each item means to the supplier, and shows how a tight brief shortens your lead time and protects your budget from the first message.
Drawing and specification items to attach
Start with the things that define the physical sign. Attach your shop drawings or, at minimum, the logo vector file, the required dimensions, the mounting surface, and the finish references such as a RAL color or Pantone. Note the wind load rating needed for outdoor installs and the CCT color temperature for the light. Suppliers price from these facts; without them they guess, and guesses become change orders later. The capabilities page shows the level of detail a good package contains, and matching that detail in your RFQ is what earns a fast, firm number back.
Also include the environment. Is the sign indoor or outdoor, wall or freestanding, lit constantly or only at night? Each answer changes the build: an outdoor unit needs IP65 sealing and a wind-rated frame, while an indoor reception piece can be lighter and simpler. Stating the setting up front prevents a quote built for the wrong conditions.
Attach reference images where words fail. A photo of the existing wall, the competitor sign you admire, or the brand guideline page removes ambiguity that a paragraph of description leaves open. Suppliers are visual by trade; a single picture of the mounting surface often answers five questions they would otherwise email back. The goal of the checklist is to make the first quote also the last round of clarification, and images are the fastest way to get there.
Commercial terms: Incoterms and packing
The checklist should state the trade terms you want, because DDP FOB EXW are three very different responsibilities. EXW means you collect from the factory gate; FOB means the supplier loads it onto the ship at the port; DDP means it arrives at your door with duties paid. Each shifts cost and risk, so naming one avoids a mismatch between the price and what you expected to handle. Also specify export packing for sea or air freight, since flimsy packing is the most common cause of damage claims and angry reception at the dock.
Do not leave the Incoterm for the supplier to assume. A quote returned as EXW looks cheap until you realize you are arranging freight, insurance, and customs yourself; a DDP quote looks higher but lands complete. The checklist exists to make those responsibilities explicit so you compare like with like across factories. Spell the term in the same sentence as the price so the number cannot be read in isolation, and note which party handles insurance and customs clearance, because that detail is exactly where two “similar” quotes quietly diverge.
Timing and how to get a free quote
State your required lead time honestly. Standard production runs 10-25 working days, and a compressed schedule should be flagged so the supplier can confirm feasibility rather than promising and missing. Most factories will get a free quote from a complete checklist within a day, and some offer an instant quote tool for standard items. Duoyuan’s one-stop process from consultation to fabrication and installation means the same team that quotes builds, which keeps the number honest and removes the gap between estimate and reality.
Finally, name your approval process. If drawings need sign-off from a head office or a landlord, say so, because that step sits inside your lead time whether or not the factory knows about it. A checklist that includes the decision timeline helps the supplier plan production slots instead of chasing approvals after the fact.
One more line worth adding is the budget range, stated as a band rather than a hard number. Giving a factory a target lets them propose the right construction to hit it, whether that means a slimmer light box or a standard finish instead of a custom one. Many buyers withhold the budget out of habit, but on a custom product the budget is itself a specification, and sharing it usually produces a more honest, more usable quote than leaving the supplier to guess at the top of the market.
What a completed checklist looks like
A finished RFQ reads like a mini spec rather than a wish list. It opens with the project basics: site country and address, indoor or outdoor, quantity, and the required delivery date mapped against the 10-25 working day lead time. It then attaches the drawing or vector file, lists finish references such as RAL color or Pantone, states the CCT color temperature, names the Incoterm among DDP FOB EXW, and specifies export packing. A supplier receiving that document can price within a day and rarely needs to come back with questions, which is the entire point of the exercise.
Keep the checklist as a living template. The first time you fill it in it feels slow, but by the third project it is a copy-paste with a few numbers changed, and the consistency it buys across quotes is exactly what lets you compare factories honestly. Pair it with a photo of the mounting surface and you remove the last common source of surprise at install.
Version the checklist per project rather than rewriting it each time. Keep a master template with the constant items, then clone it and fill the variables: dimensions, finish, Incoterm, and date. This discipline is what lets a buyer send three RFQs in a morning and receive three comparable quotes by the next, which is the real productivity gain a checklist promises. The downloadable file is only useful if it is actually reused, so build the habit and the quotes get faster and tighter with every project you run.
Frequently asked questions
What is the fastest way to get a free quote for LED letters?
Send a complete checklist: vector logo, dimensions, finish references, mounting surface, and trade terms. A complete brief lets most suppliers return a priced quote within a single working day.
Can I get an instant quote without drawings?
For standard items some suppliers offer an instant quote tool, but custom letters still need dimensions and finish references; without them any instant number is only a rough starting point.
How does lead time affect my RFQ?
Standard lead time is 10-25 working days. State your deadline in the RFQ so the supplier can confirm whether a compressed schedule is feasible before quoting a date they cannot meet.
What do DDP FOB EXW mean for my order?
EXW is factory collection, FOB includes loading at the port, and DDP delivers to your door with duties paid. Naming one in the RFQ sets who carries cost and risk at each step.
Why specify export packing on the checklist?
Export packing protects the sign through sea or air freight; without it, transit damage is common and resolving a claim is slower than simply packing the sign correctly from the start.
Which shop drawings should I attach to the RFQ?
Attach the general arrangement, material schedule, LED and mounting details, and the wind load rating if outdoor. The more the drawing states, the tighter and faster the returned quote will be.
Download the checklist and start a quote with the illuminated letters team, or read the FAQ for more on terms and timing. The solutions page maps options to building types, the case studies show delivered programs, and the about page covers the 5,000+ sqm workshop. Reach the team directly via contact.







